For striping
- Amount of line: the number of stalls, lanes, arrows, crosswalks, and stencils.
- New layout or re-stripe: a new layout takes more measuring and marking than tracing existing lines.
- ADA and fire lanes: symbols, aisles, red curbs, and lettering add detail.
- Paint or thermoplastic: thermoplastic costs more up front and lasts longer.
- Signs, wheel stops, and bollards, if you need them.
For sealcoating
- Lot size, measured in square feet.
- Condition: how many cracks need sealing and how much patching needs to be done first.
- Oil spots that need priming.
- Number of coats and the sealer mix.
For every job
- Access and phasing: whether the lot can be closed all at once or needs to be done in sections.
- Scheduling: nights and weekends to keep a business open.
- Location: travel from our base in Kissimmee.
- Bundling: doing seal, patch, and stripe in one project is usually more efficient than separate trips.
Get a real number
The fastest way to a real number is to send us the property address and what you need. Estimates are free.
Ready for a real number?
Estimates are free. The address and a short list of what you need is all it takes to start. (407) 707-6837 · estimate form